changefailurerate.com

Change failure rate by deploy frequency

The throughput-vs-stability question, settled. Elite teams sit bottom-right.

OW
Oliver Wakefield-Smith
Founder, Digital Signet. Built siemcost / monitoringcost / itbudgetcalculator.
Updated 3 Nov 2026
Direct answer
In the 2024 DORA report, Elite teams deployed on demand (multiple times per day) with a 5% change failure rate, while Low teams deployed between once a month and once every six months with a 40% rate DORA 2024 Report2024. Deploying less often did not go with failing less.
0%10%20%30%40%0.1110100Elite 5%High 20%Medium 10%Low 40%youdeploys per week (log scale)CFR %
Bars: the four performance levels in the 2024 DORA report (deploy-frequency range, cluster change failure rate). Pink dot: your team.

The four levels

Elite: on demand, 5% change failure rate. High: between once per day and once per week, 20%. Medium: between once per week and once per month, 10%. Low: between once per month and once every six months, 40% DORA 2024 Report2024. The High cluster's rate was higher than Medium's, so the relationship is not a straight line; the pattern is that the fastest deployers also had among the lowest failure rates.

Where your team plots

The chart shows each 2024 level as a bar across its deploy-frequency range. Run the main calculator on the homepage to place your own team on it.

Continue reading