Change failure rate calculator: 90-day window
The quarterly cadence. Statistically powerful, freshness-adverse.
Where your team plots vs DORA cohort
CFR (y) by deploys per week (x), against the four performance levels in the 2024 DORA report.
Would a DORA vendor pay back at this CFR?
Payback depends on how far a tool would cut your CFR. No vendor publishes a measured reduction, so set your own assumption. Quote-only vendors do not display a per-seat rate.
The staleness trade-off
A 90-day CFR is structurally stable but slow to reflect change. If you ship a CI improvement on day 1, the headline metric will not fully reflect it until day 90. Pair the 90-day with a 30-day trailing window to keep tactical signal alive.
Board-deck framing
For a board deck: report the 90-day headline number, the 30-day trend line, and the 2025 DORA percentile DORA 2025 Report (Figure 14)2025. Compare "improvement vs prior quarter" on the rolling 90-day figure so the two quarters are measured the same way.